Tengu Core - Augmented Graviton Reactor
Tech IIICaldari Core SubsystemsTengu Core - Augmented Graviton Reactor — Tech III Core Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Caldari Subsystems/Tengu Core - Augmented Graviton Reactor
Comprised of countless nanomachines that enhance the energy flow from a ship's graviton reactor, this core subsystem offers a pilot the option of increasing the power grid and capacitor capacity of their vessel. Designers of Tech III vessels were initially hampered by the problem of how to design a modular ship that could swap out basic engineering upgrades on a per-need basis. This proved particularly true when it came to reinforcing a vessel's power grid and capacitor banks without the use of batteries. In the end, the provision of nanomachines constructed from fullerene-based polymers allowed for solutions that had only existed in theory up until that point.
Jita Price
34.53m ISK
90d Avg
36.18m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-05)
34.53m ISK
90d Average
36.18m ISK
90d High
38.56m ISK
90d Low
10.24m ISK
Avg Daily Volume
106
Variations(3)
Tengu Core - Electronic Efficiency Gate
Tech III
Tengu Core - Augmented Graviton Reactor
Tech III
Tengu Core - Obfuscation Manifold
Tech III
Recent Destructions
View all →Tengu· Tdiamond · 4GYV-Q
1.13bTengu· Rico Masamune · GRNJ-3
760.08mTengu· Tdiamond · 8TPX-N
1.13bTengu· Galik Gorro · J122656
986.38mTengu· Iphariel · J103448
494.04mTengu· Judd Hoos · Rashagh
542.58mTengu· Mrakovey · J225949
766.20mTengu· Ghostloket · J120928
788.98mTengu· GhostReporting · J104632
580.82mTengu· iOlaf · Uotila
908.54mRequired Skills
Attributes
Structure HP40
Capacitor Capacity50.0 GJ
Reprocessing Materials
Properties
Type ID45626
Group ID958
Category ID32
Mass1,200,000 kg
Volume40 m³
Portion Size1
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-0534.53m77
2026-08-0435.01m77
2026-08-0336.36m114
2026-08-0235.37m100
2026-08-0135.90m81
2026-07-3136.34m85
2026-07-3037.07m105
2026-07-2935.94m84
2026-07-2836.05m81
2026-07-2736.33m90
2026-07-2636.19m86
2026-07-2536.26m198
2026-07-2436.10m84
2026-07-2337.00m120
2026-07-2235.98m95
2026-07-2136.71m107
2026-07-2036.97m113
2026-07-1936.70m130
2026-07-1836.71m123
2026-07-1736.89m117
2026-07-1636.57m161
2026-07-1536.25m82
2026-07-1436.70m151
2026-07-1336.28m119
2026-07-1236.30m138
2026-07-1136.34m144
2026-07-1036.33m97
2026-07-0936.67m110
2026-07-0836.75m138
2026-07-0736.33m158