Legion Propulsion - Intercalated Nanofibers
Tech IIIAmarr Propulsion SubsystemsLegion Propulsion - Intercalated Nanofibers — Tech III Propulsion Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Amarr Subsystems/Legion Propulsion - Intercalated Nanofibers
Constructed from hard yet lightweight fullerene polymers, these intercalated fibers boost the speed and agility of a starship without compromising its structural resilience. Even though basic nanofibers have existed for hundreds of years, the integration of various Sleeper-based salvage and other polymers takes the technology to a completely new level of modularity. This has allowed the same centuries-old technology to be ported over to the new Tech III paradigm.
Jita Price
35.46m ISK
90d Avg
35.69m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-13)
35.46m ISK
90d Average
35.69m ISK
90d High
44.35m ISK
90d Low
30.07m ISK
Avg Daily Volume
40
Variations(3)
Legion Propulsion - Interdiction Nullifier
Tech III
Legion Propulsion - Intercalated Nanofibers
Tech III
Legion Propulsion - Wake Limiter
Tech III
Recent Destructions
View all →Legion· Another lost Alpha · J142117
773.97mLegion· Ciro Herpoimichyn · Konola
437.28mLegion· Lars Fjell · A5MT-B
1.83bLegion· Gruz Hirada · 7-K5EL
496.08mLegion· Gruz Hirada · 7-K5EL
453.16mLegion· Kaito Shinoda · V-NL3K
1.79bLegion· Fouly Eoman · Sharza
583.09mLegion· hokkar Vokan · Tama
812.90mLegion· Oneo Neone · J213924
676.84mLegion· Rukh1 · J213924
1.21bRequired Skills
Attributes
Structure HP40
Reprocessing Materials
Properties
Type ID45611
Group ID957
Category ID32
Mass1,400,000 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1335.46m27
2026-08-1235.80m44
2026-08-1134.54m17
2026-08-1036.85m16
2026-08-0936.47m91
2026-08-0835.57m50
2026-08-0733.88m29
2026-08-0634.62m28
2026-08-0534.50m33
2026-08-0433.72m12
2026-08-0334.54m31
2026-08-0233.36m38
2026-08-0134.44m21
2026-07-3134.50m12
2026-07-3034.68m27
2026-07-2935.09m21
2026-07-2835.08m46
2026-07-2735.92m30
2026-07-2635.63m27
2026-07-2535.16m56
2026-07-2435.32m33
2026-07-2334.81m19
2026-07-2234.90m43
2026-07-2133.98m58
2026-07-2033.64m21
2026-07-1933.85m37
2026-07-1833.30m28
2026-07-1733.77m19
2026-07-1633.84m26
2026-07-1533.18m43