Tengu Offensive - Support Processor

Tengu Offensive - Support Processor

Tech IIICaldari Offensive Subsystems

Tengu Offensive - Support Processor — Tech III Offensive Subsystem (Subsystem) — EVE Online item

After countless failed projects over the years, the dream of linking fleets with sub-Battlecruiser hulls was eventually shelved and relegated to the realm of engineering theory. It remained this way for some time, tempting few starship manufacturers to revisit the challenge, even after the discovery of ancient Sleeper designs and the influx of fullerene-based technology. It was not until the first Strategic Cruiser hulls began appearing in small numbers across the empires that they began to truly appreciate the potential Tech III vessels had for modifications.

Not long after, the first support processor housing became a reality, capable of mounting command bursts and repair projectors with equal ease. Although what it delivered as a standalone unit was undoubtedly impressive, what would count more in time was the way it served as a catalyst. The unit demonstrated to the wider spacefaring industry that the possibilities for Tech III ships were broader than first imagined, and in doing so, it heralded the beginning of even more radical and innovative designs.
Jita Price
36.06m ISK
90d Avg
36.42m ISK
Volume
40
Jita Market (90d)
Latest Price (2026-07-02)
36.06m ISK
90d Average
36.42m ISK
90d High
38.68m ISK
90d Low
31.68m ISK
Avg Daily Volume
9
Attributes
Structure HP40
Powergrid Output60 MW
Drone Bandwidth50 Mbit/s
Capacitor Capacity100.0 GJ
Properties
Type ID45603
Group ID956
Category ID32
Mass800,000 kg
Volume40 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0236.06m9
2026-07-0133.54m4
2026-06-3036.44m13
2026-06-2935.95m9
2026-06-2835.82m7
2026-06-2736.21m27
2026-06-2634.54m7
2026-06-2535.57m12
2026-06-2435.16m12
2026-06-2336.29m6
2026-06-2236.37m2
2026-06-2134.75m8
2026-06-2035.17m21
2026-06-1934.80m8
2026-06-1835.25m5
2026-06-1735.61m5
2026-06-1636.56m5
2026-06-1534.90m8
2026-06-1434.63m16
2026-06-1334.15m22
2026-06-1235.91m7
2026-06-1134.97m11
2026-06-1036.71m4
2026-06-0934.91m8
2026-06-0833.72m8
2026-06-0735.14m9
2026-06-0636.78m6
2026-06-0535.55m4
2026-06-0434.47m13
2026-06-0336.83m3