Legion Offensive - Support Processor

Legion Offensive - Support Processor

Tech IIIAmarr Offensive Subsystems

Legion Offensive - Support Processor — Tech III Offensive Subsystem (Subsystem) — EVE Online item

After countless failed projects over the years, the dream of linking fleets with sub-Battlecruiser hulls was eventually shelved and relegated to the realm of engineering theory. It remained this way for some time, tempting few starship manufacturers to revisit the challenge, even after the discovery of ancient Sleeper designs and the influx of fullerene-based technology. It was not until the first Strategic Cruiser hulls began appearing in small numbers across the empires that they began to truly appreciate the potential Tech III vessels had for modifications.

Not long after, the first support processor housing became a reality, capable of mounting command bursts and repair projectors with equal ease. Although what it delivered as a standalone unit was undoubtedly impressive, what would count more in time was the way it served as a catalyst. The unit demonstrated to the wider spacefaring industry that the possibilities for Tech III ships were broader than first imagined, and in doing so, it heralded the beginning of even more radical and innovative designs.
Jita Price
36.88m ISK
90d Avg
39.23m ISK
Volume
40
Jita Market (90d)
Latest Price (2026-05-17)
36.88m ISK
90d Average
39.23m ISK
90d High
44.49m ISK
90d Low
33.02m ISK
Avg Daily Volume
10
Required Skills
Attributes
Structure HP40
Powergrid Output75 MW
Drone Bandwidth75 Mbit/s
Capacitor Capacity100.0 GJ
Properties
Type ID45600
Group ID956
Category ID32
Mass800,000 kg
Volume40 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1736.88m5
2026-05-1636.53m5
2026-05-1537.86m5
2026-05-1437.20m4
2026-05-1335.74m7
2026-05-1238.22m1
2026-05-1136.88m2
2026-05-1034.72m13
2026-05-0938.09m9
2026-05-0838.05m4
2026-05-0736.13m3
2026-05-0639.32m9
2026-05-0537.51m8
2026-05-0437.73m3
2026-05-0339.37m5
2026-05-0239.36m1
2026-05-0139.41m7
2026-04-3039.48m8
2026-04-2939.23m18
2026-04-2837.84m3
2026-04-2734.91m8
2026-04-2634.21m2
2026-04-2539.79m7
2026-04-2439.35m13
2026-04-2339.84m10
2026-04-2239.31m11
2026-04-2139.37m11
2026-04-2036.38m7
2026-04-1937.42m23
2026-04-1839.94m12