Proteus Defensive - Augmented Plating
Tech IIIGallente Defensive SubsystemsProteus Defensive - Augmented Plating — Tech III Defensive Subsystem (Subsystem) — EVE Online item
Market/Ship and Module Modifications/Subsystems/Gallente Subsystems/Proteus Defensive - Augmented Plating
Although this subsystem uses the same armor nano-assemblers as standard empire technology, various optimizations have been made. Taking full advantage of recently discovered Sleeper designs, the use of fullerene-based technology has allowed for the combination of far more compact and resilient armor components.
Jita Price
35.14m ISK
90d Avg
35.83m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-05-18)
35.14m ISK
90d Average
35.83m ISK
90d High
41.09m ISK
90d Low
37.0k ISK
Avg Daily Volume
12
Variations(3)
Proteus Defensive - Covert Reconfiguration
Tech III
Proteus Defensive - Augmented Plating
Tech III
Proteus Defensive - Nanobot Injector
Tech III
Recent Destructions
View all →Proteus· Roxy Yumbreon · J215758
483.52mProteus· PlayerError · Faswiba
916.00mProteus· Sigrun Maulerant · Angymonne
613.29mProteus· 91tanhua · 1I5-0V
457.24mProteus· Nemez14 · J131304
869.00mProteus· Emmtt Hallson · Hecarrin
792.25mProteus· Emily Seulette · Sasoutikh
692.44mProteus· TimHorntons · UALX-3
640.66mProteus· Olympustopiman · J165943
481.59mProteus· Francis McLean · JI1-SY
1.60bRequired Skills
Attributes
Structure HP40
Signature Radius10 m
Reprocessing Materials
Properties
Type ID45593
Group ID954
Category ID32
Mass1,400,000 kg
Volume40 m³
Capacity300 m³
Portion Size1
Meta Level1
Tech Level3
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1835.14m30
2026-05-1736.08m18
2026-05-1637.33m9
2026-05-1534.57m7
2026-05-1435.47m7
2026-05-1332.46m7
2026-05-1235.04m4
2026-05-1134.33m13
2026-05-1037.07m16
2026-05-0935.67m17
2026-05-0833.76m7
2026-05-0726.31m18
2026-05-0631.59m14
2026-05-0533.23m4
2026-05-0432.22m8
2026-05-0336.17m21
2026-05-0232.57m9
2026-05-0135.46m5
2026-04-3036.08m7
2026-04-2937.31m5
2026-04-2835.51m8
2026-04-2735.45m9
2026-04-2636.52m12
2026-04-2536.67m33
2026-04-2435.75m7
2026-04-2334.70m8
2026-04-2236.22m6
2026-04-2135.63m13
2026-04-2035.61m16
2026-04-1936.98m12