Standup M-Set TE Research Cost Optimization II

Standup M-Set TE Research Cost Optimization II

Structure Tech IIMedium Structure Engineering Rigs

Standup M-Set TE Research Cost Optimization II — Structure Tech II Structure Engineering Rig M - TE Research Cost Optimization (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set TE Research Cost Optimization II
The Standup M-Set TE Research Cost Optimization II rig provides a means for structure operators to decrease cost requirements when performing time efficiency research in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
1.61b ISK
90d Avg
1.64b ISK
Volume
10
Jita Market (90d)
Latest Price (2026-02-21)
1.61b ISK
90d Average
1.64b ISK
90d High
1.67b ISK
90d Low
1.61b ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set TE Research Cost Optimization II
Standup M-Set TE Research Cost Optimization II
Structure Tech II
Standup M-Set TE Research Cost Optimization I
Standup M-Set TE Research Cost Optimization I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost150
Properties
Type ID43886
Group ID1846
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-02-211.61b1
2026-01-241.67b1