Standup M-Set Invention Accelerator I

Standup M-Set Invention Accelerator I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Invention Accelerator I — Structure Tech I Structure Engineering Rig M - Invention Accelerator (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Invention Accelerator I
The Standup M-Set Invention Accelerator I rig provides a means for structure operators to decrease time requirements when performing invention in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
114.90m ISK
90d Avg
141.66m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-07-04)
114.90m ISK
90d Average
141.66m ISK
90d High
170.00m ISK
90d Low
110.50m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Invention Accelerator II
Standup M-Set Invention Accelerator II
Structure Tech II
Standup M-Set Invention Accelerator I
Standup M-Set Invention Accelerator I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43880
Group ID1843
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-04114.90m1
2026-07-02113.00m1
2026-07-01113.00m1
2026-06-30114.80m1
2026-06-28113.40m2
2026-06-24120.00m1
2026-06-23129.80m1
2026-06-20159.95m2
2026-06-19159.90m1
2026-06-17159.90m1
2026-06-12164.70m1
2026-06-11164.70m2
2026-06-09164.60m1
2026-06-08147.00m3
2026-06-06139.90m2
2026-06-05146.00m1
2026-06-04140.00m1
2026-06-02148.80m1
2026-05-31148.90m2
2026-05-30144.80m2
2026-05-29144.70m1
2026-05-26148.00m1
2026-05-25120.70m2
2026-05-20130.00m1
2026-05-18135.00m1
2026-05-17140.00m1
2026-05-15147.00m1
2026-05-11147.00m1
2026-05-09131.63m3
2026-05-08124.70m1