Standup M-Set Structure Manufacturing Time Efficiency I

Standup M-Set Structure Manufacturing Time Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Structure Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Structure TE (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Structure Manufacturing Time Efficiency I
The Standup M-Set Structure Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements when manufacturing structure components, structure modules, structure rigs, Upwell structures, starbase structures and fuel blocks in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
399.90m ISK
90d Avg
413.81m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-19)
399.90m ISK
90d Average
413.81m ISK
90d High
699.70m ISK
90d Low
283.60m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Structure Manufacturing Time Efficiency II
Standup M-Set Structure Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Structure Manufacturing Time Efficiency I
Standup M-Set Structure Manufacturing Time Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-19399.90m1
2026-08-15341.80m2
2026-08-14339.00m2
2026-08-11335.00m1
2026-08-08340.00m1
2026-08-02342.00m1
2026-08-01341.00m2
2026-07-31340.00m1
2026-07-23355.00m1
2026-07-20355.00m1
2026-07-14365.00m1
2026-07-11380.00m1
2026-07-04339.90m1
2026-06-30283.60m1
2026-06-17460.00m1
2026-06-15699.70m1
2026-06-14478.45m2
2026-06-08470.00m1
2026-06-06389.90m1
2026-06-01400.00m1
2026-05-28697.70m1
2026-05-26699.70m1
2026-05-24364.95m2