Standup M-Set Structure Manufacturing Material Efficiency I

Standup M-Set Structure Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Structure Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Structure ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Structure Manufacturing Material Efficiency I
The Standup M-Set Structure Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements when manufacturing structure components, structure modules, structure rigs, Upwell structures, starbase structures and fuel blocks in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
357.50m ISK
90d Avg
381.04m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-07-09)
357.50m ISK
90d Average
381.04m ISK
90d High
469.00m ISK
90d Low
302.30m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Structure Manufacturing Material Efficiency II
Standup M-Set Structure Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Structure Manufacturing Material Efficiency I
Standup M-Set Structure Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43875
Group ID1840
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-09357.50m2
2026-07-08365.00m1
2026-07-07365.00m1
2026-07-04359.90m1
2026-07-02372.15m4
2026-06-30305.10m1
2026-06-24360.00m1
2026-06-20449.80m1
2026-06-18449.90m1
2026-06-14469.00m2
2026-06-08460.00m1
2026-06-06385.18m4
2026-06-05364.90m1
2026-06-01380.00m1
2026-05-30384.00m1
2026-05-28384.00m1
2026-05-26380.00m2
2026-05-25385.00m1
2026-05-24349.90m1
2026-05-23350.00m1
2026-05-22329.90m1
2026-05-21370.00m1
2026-05-19342.15m2
2026-05-16382.30m2
2026-05-14400.00m1
2026-05-13364.90m1
2026-05-11385.00m1
2026-05-10360.00m1
2026-05-08449.00m1
2026-05-07449.80m1