Standup M-Set Basic Capital Component Manufacturing Material Efficiency I

Standup M-Set Basic Capital Component Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Basic Capital Component Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Basic Capital Component ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
The Standup M-Set Basic Capital Component Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements when manufacturing capital ship construction components in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
375.00m ISK
90d Avg
389.73m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-07-10)
375.00m ISK
90d Average
389.73m ISK
90d High
499.70m ISK
90d Low
329.90m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
Standup M-Set Basic Capital Component Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
Standup M-Set Basic Capital Component Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43870
Group ID1839
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-10375.00m1
2026-07-09370.00m2
2026-07-04339.90m1
2026-07-01355.00m1
2026-06-30355.00m1
2026-06-25360.00m1
2026-06-23369.95m2
2026-06-19444.90m1
2026-06-07499.00m1
2026-06-06389.90m1
2026-06-03385.00m1
2026-06-02385.00m1
2026-05-29499.00m1
2026-05-28497.75m2
2026-05-26499.70m1
2026-05-25366.95m2
2026-05-22329.90m1
2026-05-21370.00m1
2026-05-18369.90m2
2026-05-16349.90m1
2026-05-14377.40m2
2026-05-11380.00m1
2026-05-08369.90m1
2026-05-02359.90m1
2026-04-30350.00m1
2026-04-24382.00m2
2026-04-23381.00m1
2026-04-22400.00m1
2026-04-21400.00m1
2026-04-15380.00m1