Standup M-Set Advanced Component Manufacturing Time Efficiency I
Structure Tech IMedium Structure Engineering RigsStandup M-Set Advanced Component Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Component TE (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Engineering Rigs/Structure Engineering Rig M - Advanced Component TE/Standup M-Set Advanced Component Manufacturing Time Efficiency I
The Standup M-Set Advanced Component Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
335.00m ISK
90d Avg
360.64m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-07)
335.00m ISK
90d Average
360.64m ISK
90d High
415.00m ISK
90d Low
334.85m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Component Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Advanced Component Manufacturing Time Efficiency I
Structure Tech I
Recent Destructions
View all →Raitaru· Unknown Pilot · J110924
3.49bRaitaru· Unknown Pilot · Tuuriainas
9.77bRaitaru· Unknown Pilot · Saikanen
1.92bRaitaru· Unknown Pilot · J164756
3.36bRaitaru· Unknown Pilot · T-LIWS
3.56bRaitaru· Unknown Pilot · J154833
3.83bRaitaru· Unknown Pilot · J220924
3.47bRaitaru· Unknown Pilot · J170151
2.92bAstrahus· Unknown Pilot · J213245
4.82bRaitaru· Unknown Pilot · J110213
3.69bRequired Skills
Attributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID43869
Category ID66
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-07335.00m1
2026-10-05340.00m1
2026-10-04339.90m1
2026-09-29343.00m1
2026-09-27340.00m1
2026-09-26340.00m1
2026-09-17365.00m2
2026-09-16390.00m1
2026-09-12410.00m1
2026-09-11415.00m1
2026-09-09415.00m1
2026-09-04338.17m3
2026-08-26355.00m1
2026-08-25360.00m1
2026-08-21370.00m1
2026-08-20380.00m1
2026-08-15347.40m2
2026-08-14340.00m1
2026-08-07340.00m1
2026-07-24355.00m1
2026-07-22355.00m1