Standup M-Set Advanced Component Manufacturing Time Efficiency I
Structure Tech IMedium Structure Engineering RigsStandup M-Set Advanced Component Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Component TE (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Component Manufacturing Time Efficiency I
The Standup M-Set Advanced Component Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
349.90m ISK
90d Avg
392.44m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-05-22)
349.90m ISK
90d Average
392.44m ISK
90d High
699.00m ISK
90d Low
300.85m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Advanced Component Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Advanced Component Manufacturing Time Efficiency I
Structure Tech I
Recent Destructions
View all →Raitaru· Unknown Pilot · J220924
3.47bRaitaru· Unknown Pilot · J170151
2.92bAstrahus· Unknown Pilot · J213245
4.82bRaitaru· Unknown Pilot · J110213
3.69bRaitaru· Unknown Pilot · J134800
6.51bAstrahus· Unknown Pilot · J165815
4.91bRaitaru· Unknown Pilot · HO4E-Q
7.14bRaitaru· Unknown Pilot · Dammalin
3.27bRaitaru· Unknown Pilot · J132754
4.45bRaitaru· Unknown Pilot · QY2Y-N
4.35bRequired Skills
Attributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID43869
Group ID1837
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-22349.90m1
2026-05-18344.90m1
2026-05-16521.95m2
2026-05-13364.90m1
2026-05-11390.00m1
2026-05-02370.45m2
2026-04-29350.00m1
2026-04-23362.55m2
2026-04-21400.00m1
2026-04-19378.67m3
2026-04-06328.90m3
2026-04-01399.90m1
2026-03-30405.00m2
2026-03-29404.63m3
2026-03-10429.90m1
2026-02-26439.90m1
2026-02-25430.00m1