Standup M-Set Advanced Component Manufacturing Material Efficiency I

Standup M-Set Advanced Component Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Component Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Component ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Component Manufacturing Material Efficiency I
The Standup M-Set Advanced Component Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 components, Tech 2 capital components, Tools, Data Interfaces and Tech 3 components in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
419.90m ISK
90d Avg
372.98m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-27)
419.90m ISK
90d Average
372.98m ISK
90d High
524.80m ISK
90d Low
273.50m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Component Manufacturing Material Efficiency II
Standup M-Set Advanced Component Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Component Manufacturing Material Efficiency I
Standup M-Set Advanced Component Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-27419.90m1
2026-08-25420.00m1
2026-08-24415.00m1
2026-08-23422.00m1
2026-08-21415.00m1
2026-08-18415.00m1
2026-08-17414.90m1
2026-08-16379.45m2
2026-08-15352.73m4
2026-08-14341.40m2
2026-08-13341.80m1
2026-08-12341.50m1
2026-08-11341.50m1
2026-08-10341.80m1
2026-08-09341.80m1
2026-08-07319.93m3
2026-08-06320.00m1
2026-08-01335.00m1
2026-07-29345.00m1
2026-07-27347.00m1
2026-07-26347.00m1
2026-07-24347.00m1
2026-07-23295.50m1
2026-07-21348.00m1
2026-07-20347.50m1
2026-07-19348.00m1
2026-07-18348.00m2
2026-07-17348.00m1
2026-07-15349.00m1
2026-07-11349.00m2