Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I

Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Large Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
The Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 battleships and jump freighters in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
344.90m ISK
90d Avg
419.09m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-18)
344.90m ISK
90d Average
419.09m ISK
90d High
699.00m ISK
90d Low
300.10m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
Standup M-Set Advanced Large Ship Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43862
Group ID1834
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18344.90m1
2026-05-17399.00m1
2026-05-16344.90m1
2026-05-14364.90m1
2026-05-08369.90m1
2026-05-02544.87m3
2026-04-29350.00m1
2026-04-24382.00m1
2026-04-15350.10m1
2026-04-10385.00m2
2026-04-06395.00m1
2026-04-05410.00m1
2026-04-02690.00m1
2026-04-01399.90m1
2026-03-31398.45m2
2026-03-30398.00m1
2026-03-24398.00m1
2026-03-22330.00m1
2026-03-19300.10m1
2026-03-10429.90m1
2026-03-08425.00m1
2026-03-05440.00m1
2026-03-02440.00m1
2026-02-27568.95m2
2026-02-23592.56m5
2026-02-21445.00m1