Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I

Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Medium Ship TE (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
The Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing Tech 2 cruisers, Tech 2 battlecruisers, Tech 2 haulers, Tech 3 cruisers, Tech 3 subsystems and exhumers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
315.00m ISK
90d Avg
425.59m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-20)
315.00m ISK
90d Average
425.59m ISK
90d High
790.00m ISK
90d Low
315.00m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43860
Group ID1833
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-20315.00m1
2026-05-18346.85m2
2026-05-16350.00m2
2026-05-13625.00m2
2026-05-11399.90m1
2026-05-02359.90m1
2026-04-27383.00m2
2026-04-23420.00m1
2026-04-19449.90m1
2026-04-01399.90m1
2026-03-29401.33m3
2026-03-18440.00m1
2026-03-11612.50m2
2026-03-10429.90m1
2026-03-07422.50m2
2026-03-05430.00m1
2026-02-26439.90m1
2026-02-23434.95m2