Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I

Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Medium Ship TE (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
The Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements for manufacturing Tech 2 cruisers, Tech 2 battlecruisers, Tech 2 haulers, Tech 3 cruisers, Tech 3 subsystems and exhumers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
374.80m ISK
90d Avg
362.08m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-18)
374.80m ISK
90d Average
362.08m ISK
90d High
499.90m ISK
90d Low
295.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
Standup M-Set Advanced Medium Ship Manufacturing Time Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-18374.80m1
2026-08-16370.00m1
2026-08-10342.50m2
2026-08-07343.90m1
2026-08-02340.00m1
2026-07-31324.40m1
2026-07-27330.00m1
2026-07-20355.00m2
2026-07-18355.00m1
2026-07-17365.00m1
2026-07-14365.00m1
2026-07-12370.00m1
2026-07-04339.95m2
2026-07-03334.63m3
2026-06-14497.45m2
2026-06-06389.90m1
2026-05-25349.90m1
2026-05-24370.00m1