Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I

Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Medium Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
The Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 cruisers, Tech 2 battlecruisers, Tech 2 haulers, Tech 3 cruisers, Tech 3 subsystems and exhumers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
344.90m ISK
90d Avg
427.89m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-18)
344.90m ISK
90d Average
427.89m ISK
90d High
749.00m ISK
90d Low
315.00m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43858
Group ID1832
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18344.90m1
2026-05-16480.97m3
2026-05-13477.45m2
2026-05-09524.98m4
2026-05-08369.90m1
2026-05-06399.80m1
2026-05-04699.70m1
2026-05-02504.80m2
2026-04-30355.00m1
2026-04-29350.00m1
2026-04-27358.73m4
2026-04-26341.50m2
2026-04-24381.00m1
2026-04-23390.00m1
2026-04-21405.00m2
2026-04-20409.90m1
2026-04-19410.00m1
2026-04-18380.00m1
2026-04-14385.00m1
2026-04-09382.50m2
2026-04-08395.00m1
2026-04-06395.00m1
2026-04-04415.00m1
2026-04-02449.00m1
2026-04-01397.45m2
2026-03-31439.95m2
2026-03-30405.00m1
2026-03-23409.00m1
2026-03-22409.00m1
2026-03-21400.00m1