Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I

Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Medium Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
The Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 cruisers, Tech 2 battlecruisers, Tech 2 haulers, Tech 3 cruisers, Tech 3 subsystems and exhumers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
397.97m ISK
90d Avg
378.42m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-15)
397.97m ISK
90d Average
378.42m ISK
90d High
505.00m ISK
90d Low
315.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
Standup M-Set Advanced Medium Ship Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-15397.97m3
2026-08-12425.00m1
2026-08-10384.90m1
2026-08-07320.46m5
2026-08-03342.00m1
2026-08-02340.00m1
2026-08-01345.00m1
2026-07-31340.00m1
2026-07-27350.00m1
2026-07-25354.00m1
2026-07-18355.00m1
2026-07-17365.00m1
2026-07-15365.00m1
2026-07-13365.00m1
2026-07-11375.00m1
2026-07-08370.00m1
2026-07-07370.00m1
2026-07-04341.60m3
2026-07-03335.00m1
2026-07-01345.00m1
2026-06-27365.00m1
2026-06-25362.45m2
2026-06-19448.90m1
2026-06-17449.00m1
2026-06-14445.00m1
2026-06-07399.00m1
2026-06-05367.45m2
2026-06-03385.00m1
2026-05-28504.37m3
2026-05-27505.00m1