Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I

Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Small Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
The Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 frigates, Tech 2 and Tech 3 destroyers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
344.90m ISK
90d Avg
424.14m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-18)
344.90m ISK
90d Average
424.14m ISK
90d High
740.00m ISK
90d Low
344.90m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43855
Group ID1830
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18344.90m1
2026-05-16344.90m1
2026-05-13362.45m2
2026-05-08699.70m1
2026-05-02379.45m2
2026-04-30350.00m2
2026-04-23381.00m1
2026-04-18385.00m2
2026-04-14385.00m1
2026-04-13380.00m1
2026-04-08395.00m1
2026-04-03430.00m1
2026-04-01397.45m2
2026-03-31399.90m1
2026-03-30425.00m3
2026-03-29409.90m1
2026-03-27414.00m1
2026-03-26410.00m1
2026-03-11740.00m1
2026-03-10429.90m1
2026-03-08425.00m1
2026-03-07425.00m1
2026-03-06420.00m1
2026-02-26434.95m2
2026-02-23434.95m2