Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I

Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Advanced Small Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
The Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing Tech 2 frigates, Tech 2 and Tech 3 destroyers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
449.00m ISK
90d Avg
400.23m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-16)
449.00m ISK
90d Average
400.23m ISK
90d High
699.70m ISK
90d Low
335.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
Standup M-Set Advanced Small Ship Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-16449.00m1
2026-08-15347.97m3
2026-08-14349.00m1
2026-08-13349.00m1
2026-07-31339.90m1
2026-07-21355.00m1
2026-07-08370.00m1
2026-07-04339.90m1
2026-07-03335.00m1
2026-07-02355.00m1
2026-06-27355.00m1
2026-06-19444.90m1
2026-06-14485.00m1
2026-06-09490.00m1
2026-06-08470.00m1
2026-06-07699.70m1
2026-06-06387.45m2
2026-06-03385.00m1
2026-06-01400.00m1
2026-05-27348.95m2
2026-05-24349.00m1