Standup M-Set Basic Large Ship Manufacturing Material Efficiency I

Standup M-Set Basic Large Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Basic Large Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Basic Large Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Structure Engineering Rig M - Basic Large Ship ME/Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
The Standup M-Set Basic Large Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing battleships, freighters and industrial command ships in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
287.90m ISK
90d Avg
364.73m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-06)
287.90m ISK
90d Average
364.73m ISK
90d High
497.00m ISK
90d Low
287.90m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
Standup M-Set Basic Large Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
Standup M-Set Basic Large Ship Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-10-06287.90m1
2026-10-05340.00m1
2026-10-04340.00m1
2026-10-02343.00m2
2026-09-30340.00m1
2026-09-26342.40m2
2026-09-25342.40m2
2026-09-19370.00m1
2026-09-17385.00m1
2026-09-16394.90m1
2026-09-12395.00m1
2026-09-11415.00m1
2026-09-10415.00m1
2026-09-07497.00m1
2026-09-04354.90m2
2026-09-02335.00m1
2026-08-29350.00m1
2026-08-27365.00m1
2026-08-22370.00m1
2026-08-19383.50m2
2026-08-18382.00m1
2026-08-14385.00m1
2026-08-09384.90m1
2026-08-07344.90m1
2026-08-06339.97m3
2026-08-04345.00m1
2026-08-03345.00m1
2026-08-02345.00m1
2026-07-31345.00m1
2026-07-26357.45m2