Aurora XL
Tech IIExtra LargeAurora XL — Tech II Advanced Beam Laser Crystal (Charge) — EVE Online item
A Carthum Conglomerate large Beam Laser Crystal based on an upgraded version of the standard radio Crystal. Huge range and damage boost but suffers from much reduced tracking and has a considerably longer cooldown than normal. The delicate crystalline structures used in the manufacture of this advanced crystal degrade with use, eventually causing it to shatter.
80% increased optimal range.
75% reduced tracking speed.
Note: This ammunition can only be used by capital tech level II and faction Beam Lasers.
80% increased optimal range.
75% reduced tracking speed.
Note: This ammunition can only be used by capital tech level II and faction Beam Lasers.
Jita Price
2.22m ISK
90d Avg
2.41m ISK
Volume
1 m³
Jita Market (90d)
Latest Price (2026-08-19)
2.22m ISK
90d Average
2.41m ISK
90d High
2.79m ISK
90d Low
1.43m ISK
Avg Daily Volume
30
Variations(6)
Recent Destructions
View all →Revelation Navy Issue· Joey Aele · Amamake
6.28bRevelation Navy Issue· Gondoleeza Ricin · S25C-K
7.89bRevelation· Joey Aele · Ahbazon
3.15bRevelation· Jadzeer DAXX · Ahbazon
3.15bRevelation· Dark Lord Queen · Ahbazon
3.14bRevelation Navy Issue· poiQAQ · M-MD31
6.71bAvatar· Baldir Reso · Meildolf
182.33bRevelation· Industry-1 MOONPIRE · Ahbazon
7.36bRevelation Navy Issue· Venom Alar · Ahbazon
8.89bRevelation· Koker Poker · Ahbazon
7.30bRequired Skills
Attributes
Structure HP1
EM Damage40
Thermal Damage24
Charge Size4
Reprocessing Materials
Properties
Type ID41336
Group ID374
Category ID8
Mass1 kg
Volume1 m³
Packaged Volume1 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-192.22m15
2026-08-182.40m52
2026-08-172.40m24
2026-08-162.40m24
2026-08-141.85m50
2026-08-112.15m21
2026-08-102.40m4
2026-08-091.50m12
2026-08-082.64m36
2026-08-062.60m14
2026-08-052.44m30
2026-08-042.30m54
2026-08-032.30m139
2026-08-022.20m6
2026-08-012.19m57
2026-07-312.20m21
2026-07-292.30m24
2026-07-262.60m30
2026-07-251.49m11
2026-07-242.64m12
2026-07-232.18m41
2026-07-222.70m1
2026-07-202.29m30
2026-07-192.75m25
2026-07-182.72m74
2026-07-172.76m40
2026-07-162.76m6
2026-07-152.76m13
2026-07-132.16m22
2026-07-121.43m6