Standup L-Set Energy Neutralizer Feedback Control I

Standup L-Set Energy Neutralizer Feedback Control I

Structure Tech ILarge Structure Combat Rigs

Standup L-Set Energy Neutralizer Feedback Control I — Structure Tech I Structure Combat Rig L - Energy Neutralizer Projection and Cap Reduction (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Combat Rigs/Standup L-Set Energy Neutralizer Feedback Control I
The Standup L-Set Energy Neutralizer Feedback Control I rig provides a means for structure operators to adjust hardware systems involved in energy neutralization emission and power control so as to improve both the capacitor economy and projection of energy neutralizers installed in their Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
2.38b ISK
90d Avg
2.05b ISK
Volume
20
Jita Market (90d)
Latest Price (2026-05-28)
2.38b ISK
90d Average
2.05b ISK
90d High
3.33b ISK
90d Low
1.00b ISK
Avg Daily Volume
2
Variations(2)
Standup L-Set Energy Neutralizer Feedback Control II
Standup L-Set Energy Neutralizer Feedback Control II
Structure Tech II
Standup L-Set Energy Neutralizer Feedback Control I
Standup L-Set Energy Neutralizer Feedback Control I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-05-282.38b5
2026-05-272.38b1
2026-05-251.84b2
2026-05-221.82b4
2026-05-202.35b2
2026-05-182.39b2
2026-05-171.17b8
2026-05-121.41b2
2026-05-092.38b2
2026-05-071.73b3
2026-05-061.40b1
2026-05-021.50b1
2026-04-291.37b3
2026-04-261.43b2
2026-04-251.80b3
2026-04-232.87b3
2026-04-181.36b2
2026-04-171.35b1
2026-04-161.35b1
2026-04-101.41b2
2026-04-061.39b1
2026-04-051.40b1
2026-04-011.51b1
2026-03-271.65b1
2026-03-263.08b1
2026-03-243.08b2
2026-03-232.40b2
2026-03-211.72b1
2026-03-172.46b2
2026-03-161.80b1