Standup M-Set Enhanced Targeting System I

Standup M-Set Enhanced Targeting System I

Structure Tech IMedium Structure Combat Rigs

Standup M-Set Enhanced Targeting System I — Structure Tech I Structure Combat Rig M - Boosted Sensors (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Combat Rigs/Standup M-Set Enhanced Targeting System I
The Standup M-Set Enhanced Targeting System I rig provides a means for structure operators to adjust hardware systems involved in target acquisition so as to enhance the scan resolution and maximum lock range of Upwell technology structure sensors.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
108.00m ISK
90d Avg
123.93m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-07-02)
108.00m ISK
90d Average
123.93m ISK
90d High
250.00m ISK
90d Low
75.00m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Enhanced Targeting System II
Standup M-Set Enhanced Targeting System II
Structure Tech II
Standup M-Set Enhanced Targeting System I
Standup M-Set Enhanced Targeting System I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID37234
Group ID1622
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-02108.00m1
2026-07-01111.25m4
2026-06-29110.00m1
2026-06-26111.00m1
2026-06-25112.14m7
2026-06-24110.00m1
2026-06-23119.95m2
2026-06-21216.43m3
2026-06-20199.70m3
2026-06-19172.25m2
2026-06-18140.00m2
2026-06-17123.67m4
2026-06-16150.00m1
2026-06-15135.02m6
2026-06-14126.00m3
2026-06-13144.50m1
2026-06-12143.15m4
2026-06-11144.70m1
2026-06-10144.80m2
2026-06-09144.80m1
2026-06-08139.50m2
2026-06-07147.00m1
2026-06-06115.95m2
2026-06-05116.00m1
2026-06-04116.00m3
2026-06-03116.00m1
2026-06-02116.00m1
2026-06-01115.00m2
2026-05-31115.90m2
2026-05-28116.00m1