Standup M-Set Electronic Warfare Economy II

Standup M-Set Electronic Warfare Economy II

Structure Tech IIMedium Structure Combat Rigs

Standup M-Set Electronic Warfare Economy II — Structure Tech II Structure Combat Rig M - EW Cap Reduction (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Combat Rigs/Standup M-Set Electronic Warfare Economy II
The Standup M-Set Electronic Warfare Economy II rig provides a means for structure operators to adjust hardware systems involved in electronic warfare power control so as to improve the capacitor economy of EW systems installed in Upwell technology structures.

This rig reduces the capacitor use of Standup Variable Spectrum ECM Jammers, Standup Target Painters, Standup Remote Sensor Dampeners, and Standup Weapon Disruptors fit to the rigged structure.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
338.00m ISK
90d Avg
296.89m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-11)
338.00m ISK
90d Average
296.89m ISK
90d High
338.70m ISK
90d Low
234.90m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Electronic Warfare Economy II
Standup M-Set Electronic Warfare Economy II
Structure Tech II
Standup M-Set Electronic Warfare Economy I
Standup M-Set Electronic Warfare Economy I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost150
Properties
Type ID37231
Group ID1620
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-11338.00m1
2026-05-09335.97m3
2026-05-07338.00m1
2026-05-06317.90m1
2026-05-04338.50m1
2026-05-03335.00m1
2026-04-09326.80m2
2026-03-27299.70m1
2026-03-26260.65m4
2026-03-24240.00m1
2026-03-16234.90m1
2026-03-12240.00m1
2026-03-01320.00m1
2026-02-27320.00m1
2026-02-24249.90m1
2026-02-23255.00m1