Standup M-Set Electronic Warfare Projection I

Standup M-Set Electronic Warfare Projection I

Structure Tech IMedium Structure Combat Rigs

Standup M-Set Electronic Warfare Projection I — Structure Tech I Structure Combat Rig M - EW projection (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Combat Rigs/Standup M-Set Electronic Warfare Projection I
The Standup M-Set Electronic Warfare Projection I rig provides a means for structure operators to adjust hardware systems involved in electronic warfare targeting so as to improve the projection of EW emissions from systems installed in Upwell technology structures.

This rig increases the optimal range and falloff of Standup Variable Spectrum ECM Jammers, Standup Target Painters, Standup Remote Sensor Dampeners, and Standup Weapon Disruptors fit to the rigged structure.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
97.92m ISK
90d Avg
110.30m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-23)
97.92m ISK
90d Average
110.30m ISK
90d High
133.50m ISK
90d Low
81.94m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Electronic Warfare Projection II
Standup M-Set Electronic Warfare Projection II
Structure Tech II
Standup M-Set Electronic Warfare Projection I
Standup M-Set Electronic Warfare Projection I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-2397.92m1
2026-08-22112.50m2
2026-08-20113.00m1
2026-08-18117.50m2
2026-08-17133.50m1
2026-08-15108.60m6
2026-08-14105.60m1
2026-08-13105.60m1
2026-08-11105.00m1
2026-08-08105.00m1
2026-08-0798.00m2
2026-08-02104.00m1
2026-07-23111.00m1
2026-07-21111.00m1
2026-07-15111.00m1
2026-07-13111.00m1
2026-07-10102.20m7
2026-07-09102.00m1
2026-07-04102.60m1
2026-07-03101.00m2
2026-07-01104.00m1
2026-06-30104.00m1
2026-06-2997.00m2
2026-06-27104.00m1
2026-06-26100.00m1
2026-06-24105.25m2
2026-06-20124.90m1
2026-06-19125.00m1
2026-06-17128.00m1
2026-06-16129.00m1