Standup M-Set Energy Neutralizer Economy II

Standup M-Set Energy Neutralizer Economy II

Structure Tech IIMedium Structure Combat Rigs

Standup M-Set Energy Neutralizer Economy II — Structure Tech II Structure Combat Rig M - Energy Neutralizer Cap Reduction (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Combat Rigs/Standup M-Set Energy Neutralizer Economy II
The Standup M-Set Energy Neutralizer Economy II rig provides a means for structure operators to adjust hardware systems involved in energy neutralization power efficiency so as to improve the capacitor economy of energy neutralizers installed in their Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
386.40m ISK
90d Avg
292.66m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-09)
386.40m ISK
90d Average
292.66m ISK
90d High
399.20m ISK
90d Low
203.00m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Energy Neutralizer Economy II
Standup M-Set Energy Neutralizer Economy II
Structure Tech II
Standup M-Set Energy Neutralizer Economy I
Standup M-Set Energy Neutralizer Economy I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost150
Properties
Type ID37223
Group ID1616
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-09386.40m3
2026-05-06317.90m1
2026-05-03359.00m1
2026-04-27324.90m1
2026-04-23332.40m2
2026-04-09330.00m1
2026-04-05299.15m2
2026-03-27275.00m1
2026-03-26279.45m4
2026-03-22239.90m1
2026-03-21224.90m1
2026-03-17216.45m2
2026-03-16234.90m2
2026-03-13245.00m1
2026-03-08294.90m1
2026-03-06290.00m1
2026-02-27325.00m1