Standup M-Set Equipment Manufacturing Time Efficiency I

Standup M-Set Equipment Manufacturing Time Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Equipment Manufacturing Time Efficiency I — Structure Tech I Structure Engineering Rig M - Equipment TE (Structure Module) — EVE Online item

The Standup M-Set Equipment Manufacturing Time Efficiency I rig provides a means for structure operators to decrease time requirements manufacturing ship modules, ship rigs, personal deployables, implants and cargo containers in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
305.10m ISK
90d Avg
347.73m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-06)
305.10m ISK
90d Average
347.73m ISK
90d High
399.70m ISK
90d Low
300.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Equipment Manufacturing Time Efficiency II
Standup M-Set Equipment Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Equipment Manufacturing Time Efficiency I
Standup M-Set Equipment Manufacturing Time Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-10-06305.10m1
2026-10-01340.00m2
2026-09-30340.00m1
2026-09-28345.00m1
2026-09-26325.00m1
2026-09-12399.70m1
2026-09-08399.70m1
2026-09-04337.40m2
2026-09-01335.00m1
2026-08-10380.00m1
2026-08-09379.90m1
2026-08-07341.45m2
2026-08-06300.00m1
2026-08-01335.90m5
2026-07-30345.00m1
2026-07-28350.00m1
2026-07-26350.00m1
2026-07-21350.00m2