Standup M-Set Drone and Fighter Manufacturing Material Efficiency I

Standup M-Set Drone and Fighter Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Drone and Fighter Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Drone and Fighter ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
The Standup M-Set Drone and Fighter Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements manufacturing drones and fighters in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
539.40m ISK
90d Avg
413.51m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-19)
539.40m ISK
90d Average
413.51m ISK
90d High
549.00m ISK
90d Low
315.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
Standup M-Set Drone and Fighter Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
Standup M-Set Drone and Fighter Manufacturing Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID37156
Group ID1822
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-19539.40m1
2026-05-18344.90m1
2026-05-16349.00m4
2026-05-13387.45m2
2026-05-11385.00m1
2026-05-09524.00m2
2026-05-05315.00m1
2026-05-02347.45m2
2026-04-29348.00m1
2026-04-25354.70m1
2026-04-23381.90m1
2026-04-20405.00m1
2026-04-18380.00m1
2026-04-14384.00m2
2026-04-07395.00m2
2026-04-05412.00m1
2026-04-04415.00m1
2026-04-01397.45m2
2026-03-30405.00m1
2026-03-28410.00m1
2026-03-26419.90m1
2026-03-25415.00m2
2026-03-24410.00m1
2026-03-21435.00m1
2026-03-15450.00m1
2026-03-10431.90m1
2026-03-06425.00m1
2026-03-05430.00m1
2026-03-02430.00m1
2026-02-27549.00m2