Standup M-Set Basic Small Ship Manufacturing Material Efficiency I

Standup M-Set Basic Small Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Basic Small Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Basic Small Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
The Standup M-Set Basic Small Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing frigates, destroyers and shuttles in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
346.95m ISK
90d Avg
387.31m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-15)
346.95m ISK
90d Average
387.31m ISK
90d High
699.70m ISK
90d Low
274.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
Standup M-Set Basic Small Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
Standup M-Set Basic Small Ship Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-15346.95m2
2026-08-14345.00m1
2026-08-09345.00m1
2026-08-08345.00m1
2026-08-06340.00m1
2026-08-04310.00m1
2026-08-01360.00m2
2026-07-31390.00m1
2026-07-30699.70m1
2026-07-26357.45m2
2026-07-10380.00m1
2026-07-09380.00m1
2026-07-07380.00m1
2026-07-04339.90m1
2026-07-03335.00m1
2026-06-27355.00m2
2026-06-23274.00m1
2026-06-15479.00m1
2026-06-13460.00m1
2026-06-12460.00m1
2026-06-11449.00m1
2026-06-06389.90m1