Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I

Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I — Structure Tech I Structure Engineering Rig M - Basic Medium Ship ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
The Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I rig provides a means for structure operators to decrease material requirements for manufacturing cruisers, battlecruisers, industrial ships and mining barges in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
375.00m ISK
90d Avg
367.90m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-20)
375.00m ISK
90d Average
367.90m ISK
90d High
525.00m ISK
90d Low
269.40m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency II
Structure Tech II
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
Standup M-Set Basic Medium Ship Manufacturing Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-20375.00m1
2026-08-18374.90m1
2026-08-15347.40m2
2026-08-14342.00m1
2026-08-10300.20m1
2026-08-09342.00m2
2026-08-06336.80m5
2026-08-04335.00m1
2026-08-02342.40m2
2026-07-31340.00m1
2026-07-30345.00m1
2026-07-28299.70m1
2026-07-27350.00m1
2026-07-26355.00m2
2026-07-25355.00m1
2026-07-20355.00m1
2026-07-18355.00m1
2026-07-15365.00m1
2026-07-13365.00m1
2026-07-11365.00m2
2026-07-10365.00m1
2026-07-05379.00m2
2026-07-04341.60m3
2026-07-03335.00m1
2026-07-02348.00m2
2026-07-01345.00m2
2026-06-27355.00m2
2026-06-23279.00m1
2026-06-19459.90m1
2026-06-16468.95m2