Capital Hydraulic Bay Thrusters II
Tech IICapital Missile Launcher RigsCapital Hydraulic Bay Thrusters II — Tech II Rig Launcher (Module) — EVE Online item
This ship modification is designed to increase missile velocity at the expense of increased CPU requirements for launchers.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
289.90m ISK
90d Avg
457.59m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-02)
289.90m ISK
90d Average
457.59m ISK
90d High
587.60m ISK
90d Low
117.70m ISK
Avg Daily Volume
3
Variations(2)
Capital Hydraulic Bay Thrusters I
Tech I
Capital Hydraulic Bay Thrusters II
Tech II
Recent Destructions
View all →Phoenix Navy Issue· Luigi mon-de-sound · J130330
5.77bPhoenix Navy Issue· JoeTheHoe · Bourar
8.58bPhoenix Navy Issue· Melkinor T'sbanion · B6-XE8
8.77bPhoenix· soft sleeves · S25C-K
6.28bPhoenix· SEXY SPICERS · S25C-K
6.22bPhoenix Navy Issue· Esclavo Minmatar 001 · J122524
8.77bPhoenix Navy Issue· Marcus Algaert · H-FOYG
9.46bPhoenix Navy Issue· Misako Romi · H-FOYG
9.52bPhoenix Navy Issue· Manella Antollare · Auga
7.81bPhoenix Navy Issue· Eva Hekkin · H-29TM
10.38bAttributes
Structure HP40
Velocity Modifier20.0%
Calibration Cost150
Reprocessing Materials
Properties
Type ID33301
GroupRig Launcher (779)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-02289.90m2
2026-09-30299.90m1
2026-09-19428.09m7
2026-09-13409.97m3
2026-09-03534.05m6
2026-09-01295.65m4
2026-08-27477.43m3
2026-08-26478.30m1
2026-08-25477.00m2
2026-08-24474.90m1
2026-08-23474.78m6
2026-08-19478.50m2
2026-08-18497.30m1
2026-08-11548.40m1
2026-08-02117.75m2
2026-07-25587.60m2
2026-07-24587.55m4
2026-07-23587.40m1
2026-07-22520.00m1
2026-07-18587.30m1