Capital Drone Mining Augmentor I
Tech ICapital Drone RigsCapital Drone Mining Augmentor I — Tech I Rig Drones (Module) — EVE Online item
This ship modification is designed to increase a ship's mining drone yield at the expense of the ship's CPU capacity.
Increases the mining yield per cycle of ore mining drones, and speeds up the cycle time of ice harvesting drones.
The drawbacks of fitting this rig may be reduced by training the Drones Rigging skill.
Increases the mining yield per cycle of ore mining drones, and speeds up the cycle time of ice harvesting drones.
The drawbacks of fitting this rig may be reduced by training the Drones Rigging skill.
Jita Price
20.92m ISK
90d Avg
17.80m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-15)
20.92m ISK
90d Average
17.80m ISK
90d High
24.20m ISK
90d Low
5.00m ISK
Avg Daily Volume
2
Variations(2)
Capital Drone Mining Augmentor I
Tech I
Capital Drone Mining Augmentor II
Tech II
Recent Destructions
View all →Rorqual· mercan gold · 4-HWWF
7.24bRorqual· Daliaerdt Ulier Gaterau · J231837
7.33bRorqual· Akupy · KRUN-N
7.08bRorqual· Evores en Daire · Hedgiviter
7.29bRorqual· Baidur Odinson · TM-0P2
5.20bRorqual· ffafner bloodlust · L-6W1J
6.95bRorqual· Star Wisp · J124007
3.94bYmir· Sappho Hill · 4CJ-AC
166.82mRorqual· xainder · Turnur
8.41bRorqual· KRILL TIMER · E-9ORY
8.57bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID33285
Group ID778
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1520.92m1
2026-08-1416.93m4
2026-08-1320.86m1
2026-08-1220.84m1
2026-08-1115.56m3
2026-08-1020.84m1
2026-08-0920.84m1
2026-08-0814.27m5
2026-08-025.00m1
2026-07-3019.50m1
2026-07-285.00m2
2026-07-255.00m1
2026-07-235.00m1
2026-07-2219.60m1
2026-07-2119.70m1
2026-07-1719.47m3
2026-07-165.03m3
2026-07-1519.67m2
2026-07-1220.30m2
2026-07-0920.50m1
2026-07-0620.84m1
2026-07-0510.35m6
2026-07-0120.87m3
2026-06-2813.00m2
2026-06-2720.91m1
2026-06-2121.00m1
2026-06-1821.00m1
2026-06-165.10m1
2026-06-1321.07m3
2026-06-1221.06m2