Medium Drone Mining Augmentor I
Tech IMedium Drone RigsMedium Drone Mining Augmentor I — Tech I Rig Drones (Module) — EVE Online item
This ship modification is designed to increase a ship's mining drone yield at the expense of the ship's CPU capacity.
Increases the mining yield per cycle of ore mining drones, and speeds up the cycle time of ice harvesting drones.
The drawbacks of fitting this rig may be reduced by training the Drones Rigging skill.
Increases the mining yield per cycle of ore mining drones, and speeds up the cycle time of ice harvesting drones.
The drawbacks of fitting this rig may be reduced by training the Drones Rigging skill.
Jita Price
936.8k ISK
90d Avg
1.24m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-08-16)
936.8k ISK
90d Average
1.24m ISK
90d High
1.40m ISK
90d Low
423.1k ISK
Avg Daily Volume
47
Variations(2)
Medium Drone Mining Augmentor I
Tech I
Medium Drone Mining Augmentor II
Tech II
Recent Destructions
View all →Mackinaw· Stagitous · RF-GGF
221.44mRetriever· Ghostdog Knights · Aldali
57.39mMackinaw· Nesmoth Skelos · B-VIP9
308.13mRetriever· bobbydicky · Piak
76.41mRetriever· Pasdawan6666 · Emolgranlan
58.97mSkiff· TyRael DoUrDenn · Avaux
305.01mCovetor· Markus Corci · New Caldari
47.66mPorpoise· Lira Viga · Y-CWQY
124.82mRetriever· DaJelly · Alachene
66.12mRetriever· Douglas Malachi · J170740
53.42mAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID32043
Group ID778
Category ID7
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-16936.8k70
2026-08-151.17m40
2026-08-141.22m20
2026-08-13434.3k210
2026-08-121.24m27
2026-08-111.29m30
2026-08-101.36m19
2026-08-091.08m52
2026-08-081.37m50
2026-08-071.18m37
2026-08-061.37m29
2026-08-051.20m42
2026-08-041.38m21
2026-08-031.34m32
2026-08-021.23m53
2026-08-011.30m37
2026-07-311.18m37
2026-07-301.40m16
2026-07-291.37m36
2026-07-281.35m27
2026-07-271.40m26
2026-07-261.16m61
2026-07-251.27m58
2026-07-241.29m13
2026-07-231.29m40
2026-07-221.39m16
2026-07-211.33m21
2026-07-201.37m33
2026-07-191.39m40
2026-07-181.37m20