Imperial Navy Large Remote Capacitor Transmitter
FactionLargeImperial Navy Large Remote Capacitor Transmitter — Faction Remote Capacitor Transmitter (Module) — EVE Online item
Market/Ship Equipment/Engineering Equipment/Remote Capacitor Transmitter/Imperial Navy Large Remote Capacitor Transmitter
Transfers capacitor energy to another ship.
Jita Price
35.55m ISK
90d Avg
41.84m ISK
Volume
25 m³
Base Price
78.8k ISK
Jita Market (90d)
Latest Price (2026-10-11)
35.55m ISK
90d Average
41.84m ISK
90d High
56.90m ISK
90d Low
33.24m ISK
Avg Daily Volume
17
Variations(6)
Large Remote Capacitor Transmitter I
Tech I
Large Radiative Scoped Remote Capacitor Transmitter
Tech I
Large Inductive Compact Remote Capacitor Transmitter
Tech I
Large Remote Capacitor Transmitter II
Tech II
'Chivalry' Large Remote Capacitor Transmitter
Storyline
Imperial Navy Large Remote Capacitor Transmitter
Faction
Recent Destructions
View all →Leshak· Minmatar Citizen 2121687517 · J105433
866.33mPaladin· Rajenn · 2IBE-N
3.01bPaladin· Drayden II · 2IBE-N
2.88bBasilisk· Chester Corvington · J111218
400.21mBasilisk· Atlas McMerc · J111218
399.66mBasilisk· Antony Amarr · J160650
344.11mPaladin· fede9567 · L-IE41
2.94bBarghest· stiege · Aunenen
1.93bLeshak· Midys · J215151
1.34bLeshak· Perry VonCooper · J215151
876.37mRequired Skills
Attributes
Activation Cost366.0 GJ
Structure HP40
Powergrid Usage352 MW
CPU Usage48 tf
Cycle Time5.0s
Reprocessing Materials
Properties
Type ID31946
Category ID7
Mass1,000 kg
Volume25 m³
Packaged Volume25 m³
Portion Size1
Radius1,000 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-1135.55m18
2026-10-1036.86m13
2026-10-0936.20m5
2026-10-0835.61m6
2026-10-0737.00m9
2026-10-0635.20m8
2026-10-0536.99m36
2026-10-0436.69m10
2026-10-0336.66m36
2026-10-0234.84m15
2026-10-0135.67m9
2026-09-3034.36m8
2026-09-2936.42m8
2026-09-2836.82m6
2026-09-2737.25m21
2026-09-2638.44m14
2026-09-2536.07m18
2026-09-2437.38m18
2026-09-2338.95m11
2026-09-2235.48m3
2026-09-2138.08m19
2026-09-2039.94m26
2026-09-1939.19m10
2026-09-1840.49m8
2026-09-1740.98m9
2026-09-1640.96m17
2026-09-1540.04m8
2026-09-1441.82m8
2026-09-1341.98m14
2026-09-1243.08m23