Capital Core Defense Operational Solidifier II

Capital Core Defense Operational Solidifier II

Tech IICapital Shield Rigs

Capital Core Defense Operational Solidifier II — Tech II Rig Shield (Module) — EVE Online item

Market/Ship and Module Modifications/Rigs/Shield Rigs/Capital Core Defense Operational Solidifier II
This ship modification is designed to reduce the duration of shield booster cycles at the expense of increased signature radius.

The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
Jita Price
646.40m ISK
90d Avg
564.47m ISK
Volume
40
Jita Market (90d)
Latest Price (2026-07-03)
646.40m ISK
90d Average
564.47m ISK
90d High
699.90m ISK
90d Low
552.5k ISK
Avg Daily Volume
3
Variations(2)
Capital Core Defense Operational Solidifier I
Capital Core Defense Operational Solidifier I
Tech I
Capital Core Defense Operational Solidifier II
Capital Core Defense Operational Solidifier II
Tech II
Attributes
Structure HP40
Calibration Cost150
Properties
Type ID31826
Group ID774
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-03646.40m1
2026-07-01654.40m1
2026-06-30658.70m2
2026-06-29569.63m3
2026-06-27641.93m3
2026-06-26641.90m2
2026-06-25633.60m9
2026-06-24629.70m1
2026-06-23637.73m7
2026-06-22638.00m1
2026-06-21638.95m2
2026-06-20570.00m2
2026-06-19639.58m6
2026-06-18639.00m1
2026-06-17638.53m9
2026-06-16638.83m3
2026-06-15574.40m2
2026-06-14571.00m2
2026-06-13564.10m1
2026-06-12564.00m1
2026-06-11566.55m4
2026-06-09569.10m4
2026-06-08569.90m5
2026-06-07566.86m5
2026-06-06551.68m6
2026-06-04569.50m2
2026-06-03571.55m2
2026-06-02567.54m5
2026-06-01566.90m2
2026-05-31555.18m10