Capital Core Defense Operational Solidifier II

Capital Core Defense Operational Solidifier II

Tech IICapital Shield Rigs

Capital Core Defense Operational Solidifier II — Tech II Rig Shield (Module) — EVE Online item

Market/Ship and Module Modifications/Rigs/Shield Rigs/Capital Core Defense Operational Solidifier II
This ship modification is designed to reduce the duration of shield booster cycles at the expense of increased signature radius.

The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
Jita Price
598.92m ISK
90d Avg
484.92m ISK
Volume
40
Jita Market (90d)
Latest Price (2026-05-18)
598.92m ISK
90d Average
484.92m ISK
90d High
699.90m ISK
90d Low
306.10m ISK
Avg Daily Volume
3
Variations(2)
Capital Core Defense Operational Solidifier I
Capital Core Defense Operational Solidifier I
Tech I
Capital Core Defense Operational Solidifier II
Capital Core Defense Operational Solidifier II
Tech II
Attributes
Structure HP40
Calibration Cost150
Properties
Type ID31826
Group ID774
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18598.92m4
2026-05-17577.73m4
2026-05-16512.63m4
2026-05-15512.00m3
2026-05-13510.60m3
2026-05-12509.70m3
2026-05-11511.23m3
2026-05-10512.80m3
2026-05-09499.82m4
2026-05-08506.25m2
2026-05-07512.65m4
2026-05-06513.47m3
2026-05-05513.80m3
2026-05-04533.60m3
2026-05-03534.20m8
2026-05-02535.33m4
2026-05-01537.95m4
2026-04-30539.50m2
2026-04-29540.20m2
2026-04-28482.25m2
2026-04-27524.00m3
2026-04-26590.87m3
2026-04-25595.65m2
2026-04-24598.05m2
2026-04-23335.90m1
2026-04-20628.54m5
2026-04-19632.70m3
2026-04-17635.55m2
2026-04-16644.20m1
2026-04-15647.30m1