Capital Core Defense Capacitor Safeguard I
Tech ICapital Shield RigsCapital Core Defense Capacitor Safeguard I — Tech I Rig Shield (Module) — EVE Online item
This ship modification is designed to reduce the capacitor need of modules which require shield operation skills at the expense of increased signature radius.
The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
Jita Price
5.83m ISK
90d Avg
3.76m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-04)
5.83m ISK
90d Average
3.76m ISK
90d High
6.00m ISK
90d Low
0 ISK
Avg Daily Volume
2
Variations(2)
Capital Core Defense Capacitor Safeguard I
Tech I
Capital Core Defense Capacitor Safeguard II
Tech II
Recent Destructions
View all →Naglfar· cpt diesil · Villasen
4.81bPhoenix· Hello256 Hakoke · 8F-TK3
3.75bPhoenix· chu meng · BKG-Q2
3.48bPhoenix· Evan W · 1DH-SX
4.63bNaglfar· Allmonko Ryzerama · 6-CZ49
5.16bPhoenix· Echo A1 · HYPL-V
4.38bRorqual· SergeantCAO CAOCAOCAO · 111-F1
4.55bPhoenix Navy Issue· PhoenixHeart · Vlillirier
8.48bRorqual· Raffy Lee · Jovainnon
6.49bPhoenix Navy Issue· Ionis en Gravonere · J160941
12.36bAttributes
Structure HP40
Calibration Cost50
Reprocessing Materials
Properties
Type ID31768
GroupRig Shield (774)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-045.83m1
2026-10-026.00m5
2026-09-266.00m2
2026-09-256.00m1
2026-09-166.00m1
2026-09-155.00m12
2026-09-133.33m3
2026-09-125.00m2
2026-09-115.00m1
2026-09-08100.5k1
2026-09-055.00m4
2026-09-035.00m4
2026-09-015.00m4
2026-08-294.99m1
2026-08-284.00m4
2026-08-264.00m1
2026-08-245.00m1
2026-08-225.00m4
2026-08-205.00m1
2026-08-122.91m1
2026-08-102.91m2
2026-08-092.51m7
2026-08-042.91m4
2026-08-032.91m1
2026-08-012.91m1
2026-07-302.91m1
2026-07-292.91m2
2026-07-271.45m2
2026-07-262.91m2
2026-07-252.91m1