Capital Thermal Shield Reinforcer I
Tech ICapital Shield RigsCapital Thermal Shield Reinforcer I — Tech I Rig Shield (Module) — EVE Online item
This ship modification is designed to increase the thermal resistance of ship shields at the expense of increased signature radius.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Shield Rigging skill.
Jita Price
6.68m ISK
90d Avg
4.51m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-16)
6.68m ISK
90d Average
4.51m ISK
90d High
6.69m ISK
90d Low
0 ISK
Avg Daily Volume
2
Variations(2)
Capital Thermal Shield Reinforcer I
Tech I
Capital Thermal Shield Reinforcer II
Tech II
Recent Destructions
View all →Naglfar Fleet Issue· Shaadan · 9P4O-F
9.77bRorqual· Knoer · G96R-F
5.99bRorqual· Joseph Ghostie · Amamake
5.57bNaglfar· Fred Fred Burger · MJ-5F9
4.11bNaglfar· Aiden Malcolm · Ahbazon
2.77bNaglfar· Ying Aihaken · HPS5-C
3.78bPhoenix· KONGLONGKANGLANG11 · UH-9ZG
5.30bNaglfar· Wolfino · Uanzin
4.26bNaglfar· BCGGaming · 1KAW-T
3.24bNidhoggur· Lilinador · G-D0N3
4.40bAttributes
Structure HP40
Calibration Cost50
Reprocessing Materials
Properties
Type ID31756
Group ID774
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-166.68m2
2026-08-136.68m4
2026-08-126.68m1
2026-08-116.68m1
2026-08-106.68m1
2026-08-096.65m3
2026-08-083.25m2
2026-08-076.50m1
2026-08-016.69m5
2026-07-296.69m1
2026-07-286.69m4
2026-07-276.69m2
2026-07-266.69m1
2026-07-256.69m1
2026-07-246.69m2
2026-07-236.69m1
2026-07-226.69m1
2026-07-214.99m2
2026-07-184.99m1
2026-07-164.99m1
2026-07-154.99m1
2026-07-134.99m1
2026-07-124.98m8
2026-07-114.98m1
2026-07-064.99m4
2026-07-054.99m4
2026-07-044.99m1
2026-07-034.99m1
2026-07-024.99m2
2026-06-294.99m3