Capital Projectile Metastasis Adjuster II
Tech IICapital Projectile Weapon RigsCapital Projectile Metastasis Adjuster II — Tech II Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Capital Projectile Metastasis Adjuster II
This ship modification is designed to increase the tracking speed of all projectile turrets at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
94.68m ISK
90d Avg
80.80m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-25)
94.68m ISK
90d Average
80.80m ISK
90d High
190.00m ISK
90d Low
24.06m ISK
Avg Daily Volume
3
Variations(2)
Capital Projectile Metastasis Adjuster I
Tech I
Capital Projectile Metastasis Adjuster II
Tech II
Recent Destructions
View all →Naglfar Fleet Issue· Demaga 1 · J103448
6.65bNaglfar Fleet Issue· RedBerret · J130302
8.50bNaglfar· kns kns · J153222
6.19bNaglfar Fleet Issue· Cuihua Led · J105801
10.40bNaglfar Fleet Issue· Kati Saeel · J105801
9.35bNaglfar Fleet Issue· Henning fon Holzendorf · J164732
9.09bNaglfar· Argo Vallerian · J133537
6.05bNaglfar Fleet Issue· Kleine Wolke · J115950
8.63bNaglfar· karma mama · J141032
5.10bNaglfar Fleet Issue· EMF Coldwarrior · J135036
7.31bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31714
Group ID777
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2594.68m3
2026-08-2495.79m5
2026-08-2296.59m4
2026-08-2197.12m3
2026-08-2085.71m4
2026-08-1999.12m2
2026-08-1899.44m1
2026-08-1799.78m1
2026-08-16100.64m2
2026-08-15104.44m5
2026-08-13117.10m1
2026-08-12120.00m1
2026-08-10122.75m2
2026-08-09124.80m2
2026-08-08128.00m3
2026-08-07130.60m3
2026-08-04135.80m1
2026-08-03135.90m1
2026-08-02138.05m2
2026-08-01159.50m2
2026-07-31186.10m2
2026-07-29116.17m3
2026-07-2879.23m1
2026-07-2779.22m1
2026-07-2679.22m1
2026-07-2562.48m7
2026-07-2461.28m4
2026-07-2350.53m3
2026-07-2161.25m2
2026-07-2061.34m1