Capital Projectile Burst Aerator II
Tech IICapital Projectile Weapon RigsCapital Projectile Burst Aerator II — Tech II Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Capital Projectile Burst Aerator II
This ship modification is designed to increase a ship's projectile turret rate of fire at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
79.85m ISK
90d Avg
97.16m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-24)
79.85m ISK
90d Average
97.16m ISK
90d High
151.70m ISK
90d Low
50.40m ISK
Avg Daily Volume
2
Variations(2)
Capital Projectile Burst Aerator I
Tech I
Capital Projectile Burst Aerator II
Tech II
Recent Destructions
View all →Naglfar Fleet Issue· Jack Daniels10 · J142631
8.33bNaglfar· xuebi online · WY-9LL
5.14bNaglfar Fleet Issue· Shaadan · 9P4O-F
9.77bNaglfar Fleet Issue· Ms R · J015227
6.38bNaglfar· MiniEVILone · Kourmonen
4.17bNaglfar· drbforever drbforever · Unefsih
3.19bNaglfar· QianXunQianYing · QI-S9W
3.90bNaglfar Fleet Issue· Targosh · J115405
6.50bNaglfar· Zlbldnia · Maseera
4.16bNaglfar· ucma · Maseera
4.16bAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31678
Group ID777
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2479.85m1
2026-08-1988.83m1
2026-08-1788.95m1
2026-08-1678.94m15
2026-08-1378.94m3
2026-08-1179.38m1
2026-08-1079.77m1
2026-08-0883.27m1
2026-07-2985.77m1
2026-07-2887.86m2
2026-07-2289.94m1
2026-07-1950.43m2
2026-07-1792.21m1
2026-07-1692.35m1
2026-07-1194.13m1
2026-07-1094.17m1
2026-07-0695.20m1
2026-07-0495.63m1
2026-07-0296.14m1
2026-06-2996.79m1
2026-06-2796.83m1
2026-06-2697.72m13
2026-06-23104.80m1
2026-06-2280.81m2
2026-06-21109.00m1
2026-06-15126.60m1
2026-06-14128.40m2
2026-06-13131.00m1
2026-06-08145.80m1
2026-06-05151.70m1