Medium Projectile Burst Aerator II
Tech IIMedium Projectile Weapon RigsMedium Projectile Burst Aerator II — Tech II Rig Projectile Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's projectile turret rate of fire at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
4.34m ISK
90d Avg
5.26m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-11)
4.34m ISK
90d Average
5.26m ISK
90d High
10.59m ISK
90d Low
3.46m ISK
Avg Daily Volume
23
Variations(2)
Medium Projectile Burst Aerator I
Tech I
Medium Projectile Burst Aerator II
Tech II
Recent Destructions
View all →Hurricane Fleet Issue· kab0ss · T-Q2DD
270.43mHurricane Fleet Issue· SOILWORK · T-Q2DD
263.53mHurricane Fleet Issue· Kz KENER · T-Q2DD
292.93mHurricane Fleet Issue· SOILWORK · J5A-IX
263.80mHurricane Fleet Issue· Kz KENER · J5A-IX
275.67mHurricane Fleet Issue· kab0ss · J5A-IX
311.26mHurricane Fleet Issue· kab0ss · Z-8Q65
291.38mHurricane Fleet Issue· SOILWORK · Z-8Q65
262.83mHurricane Fleet Issue· Kz KENER · AZBR-2
286.33mHurricane Fleet Issue· Kiwi Kessel · Ibaria
150.70mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31676
Category ID7
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-114.34m71
2026-10-104.36m64
2026-10-094.32m87
2026-10-084.36m58
2026-10-074.36m80
2026-10-064.37m54
2026-10-054.39m25
2026-10-044.32m22
2026-10-034.40m19
2026-10-024.45m51
2026-10-014.48m8
2026-09-304.48m14
2026-09-294.78m15
2026-09-285.16m16
2026-09-275.26m14
2026-09-265.44m10
2026-09-256.10m8
2026-09-246.20m16
2026-09-236.65m7
2026-09-227.85m15
2026-09-218.90m50
2026-09-209.54m14
2026-09-199.65m12
2026-09-188.98m16
2026-09-1710.45m8
2026-09-1610.54m12
2026-09-157.44m17
2026-09-149.72m21
2026-09-137.91m32
2026-09-124.80m12