Medium Projectile Ambit Extension II
Tech IIMedium Projectile Weapon RigsMedium Projectile Ambit Extension II — Tech II Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Medium Projectile Ambit Extension II
This ship modification is designed to increase a ship's projectile turret accuracy falloff range at the expense of increased power grid need for projectile weapons.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
5.98m ISK
90d Avg
4.41m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-08-26)
5.98m ISK
90d Average
4.41m ISK
90d High
19.42m ISK
90d Low
445.1k ISK
Avg Daily Volume
24
Variations(2)
Medium Projectile Ambit Extension I
Tech I
Medium Projectile Ambit Extension II
Tech II
Recent Destructions
View all →Vagabond· Dreydan Trovirr · ABE-M2
338.32mKhizriel· RuGret · Siseide
1.33bCynabal· Guth · Siseide
314.31mVagabond· Dianou Katelo · AZBR-2
201.77mVagabond· Muu Arr · BEG-RL
271.39mStabber Fleet Issue· Ezen Ezenich · Ardar
76.41mSleipnir· Jommy Vlearon · 6Q-R50
1.61bStabber Fleet Issue· Rollo Onzo · Eytjangard
87.55mVagabond· Zentron Kalkoken · A-5F4A
215.74mStabber Fleet Issue· Ararie Thellere · Alsavoinon
74.78mAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31664
Group ID777
Category ID7
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-265.98m19
2026-08-256.42m15
2026-08-246.48m12
2026-08-236.50m14
2026-08-226.55m14
2026-08-216.57m30
2026-08-206.59m13
2026-08-196.61m13
2026-08-186.57m9
2026-08-176.87m13
2026-08-167.78m17
2026-08-155.29m9
2026-08-142.86m21
2026-08-132.78m56
2026-08-122.60m22
2026-08-112.68m37
2026-08-102.70m43
2026-08-092.69m20
2026-08-082.84m36
2026-08-072.81m37
2026-08-062.85m5
2026-08-052.89m23
2026-08-042.90m15
2026-08-032.90m27
2026-08-022.91m23
2026-08-012.89m24
2026-07-312.90m19
2026-07-302.98m9
2026-07-293.09m19
2026-07-283.17m28