Capital Warhead Rigor Catalyst II
Tech IICapital Missile Launcher RigsCapital Warhead Rigor Catalyst II — Tech II Rig Launcher (Module) — EVE Online item
This ship modification is designed to decrease the signature radius factor for missile explosions at the expense of increased CPU requirements for launchers.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
346.72m ISK
90d Avg
449.76m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-01)
346.72m ISK
90d Average
449.76m ISK
90d High
569.90m ISK
90d Low
292.70m ISK
Avg Daily Volume
7
Variations(2)
Capital Warhead Rigor Catalyst I
Tech I
Capital Warhead Rigor Catalyst II
Tech II
Recent Destructions
View all →Phoenix Navy Issue· Tasaro Sunji · 9CG6-H
9.61bPhoenix· colt45 · Amamake
4.13bPhoenix Navy Issue· CrackerC · 6VDT-H
7.52bPhoenix Navy Issue· DanielMapuo · J111000
12.45bPhoenix Navy Issue· Shiro Nakamoto · J111029
7.16bPhoenix Navy Issue· Kenzo Nakamoto · J111029
8.21bPhoenix· Xtra Squishy lol · Amamake
4.24bPhoenix Navy Issue· CrackerC · Amamake
8.63bPhoenix Navy Issue· Michael Marsh · J110117
8.12bPhoenix Navy Issue· Dustin's Side Piece · J151530
10.96bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31654
GroupRig Launcher (779)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-01346.72m5
2026-09-30349.35m6
2026-09-29397.53m6
2026-09-28409.34m8
2026-09-27414.94m9
2026-09-26418.16m9
2026-09-25422.08m10
2026-09-24401.30m6
2026-09-23354.40m18
2026-09-22438.30m10
2026-09-21441.95m8
2026-09-20447.92m5
2026-09-19450.13m6
2026-09-18340.98m21
2026-09-17339.08m5
2026-09-16338.76m18
2026-09-15341.53m3
2026-09-14344.37m3
2026-09-13346.90m2
2026-09-12349.50m5
2026-09-11363.10m14
2026-09-10364.20m5
2026-09-09368.80m9
2026-09-08379.58m5
2026-09-07448.75m4
2026-09-06450.70m6
2026-09-05454.73m13
2026-09-04462.75m2
2026-09-03466.46m5
2026-09-02470.07m4