Capital Warhead Flare Catalyst II
Tech IICapital Missile Launcher RigsCapital Warhead Flare Catalyst II — Tech II Rig Launcher (Module) — EVE Online item
This ship modification is designed to decrease the effect of a target's velocity in avoiding the radius of missile explosions at the expense of increased CPU requirements for launchers.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
580.70m ISK
90d Avg
479.74m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-07-02)
580.70m ISK
90d Average
479.74m ISK
90d High
785.00m ISK
90d Low
137.20m ISK
Avg Daily Volume
3
Variations(2)
Capital Warhead Flare Catalyst I
Tech I
Capital Warhead Flare Catalyst II
Tech II
Recent Destructions
View all →Phoenix Navy Issue· CrackerC · K7D-II
8.11bPhoenix Navy Issue· CrackerC · 7AH-SF
8.05bPhoenix Navy Issue· XCuseMeMadam · RKE-CP
7.60bPhoenix Navy Issue· CrackerC · RKE-CP
8.21bPhoenix Navy Issue· CrackerC · Amamake
7.22bPhoenix Navy Issue· Ekanona · J233658
7.38bPhoenix Navy Issue· Zajic Zajicova · K7D-II
8.17bPhoenix Navy Issue· CrackerC · M-OEE8
8.17bPhoenix Navy Issue· CrackerC · Amamake
8.73bPhoenix Navy Issue· Akava Ozran · 0VK-43
12.49bAttributes
Structure HP40
Calibration Cost75
Reprocessing Materials
Properties
Type ID31642
Group ID779
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-02580.70m2
2026-06-30585.35m2
2026-06-29541.47m6
2026-06-28594.74m5
2026-06-26602.90m1
2026-06-25604.70m7
2026-06-24609.40m1
2026-06-22600.83m4
2026-06-21571.40m12
2026-06-20540.19m7
2026-06-19531.40m3
2026-06-16588.27m3
2026-06-15609.80m1
2026-06-14611.13m4
2026-06-13626.40m7
2026-06-12611.03m3
2026-06-11611.73m3
2026-06-10612.25m2
2026-06-09613.42m4
2026-06-08617.20m1
2026-06-07519.20m2
2026-06-06647.15m2
2026-06-05647.40m2
2026-06-04648.50m2
2026-06-03784.90m1
2026-06-02651.00m3
2026-06-01588.70m1
2026-05-31513.17m4
2026-05-30510.87m3
2026-05-29510.25m2