Capital Warhead Flare Catalyst II
Tech IICapital Missile Launcher RigsCapital Warhead Flare Catalyst II — Tech II Rig Launcher (Module) — EVE Online item
This ship modification is designed to decrease the effect of a target's velocity in avoiding the radius of missile explosions at the expense of increased CPU requirements for launchers.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
The drawbacks of fitting this rig may be reduced by training the Launcher Rigging skill.
Jita Price
318.73m ISK
90d Avg
463.15m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-01)
318.73m ISK
90d Average
463.15m ISK
90d High
607.55m ISK
90d Low
63.31m ISK
Avg Daily Volume
4
Variations(2)
Capital Warhead Flare Catalyst I
Tech I
Capital Warhead Flare Catalyst II
Tech II
Recent Destructions
View all →Phoenix Navy Issue· Tasaro Sunji · 9CG6-H
9.61bPhoenix Navy Issue· CrackerC · 6VDT-H
7.52bPhoenix Navy Issue· CrackerC · Amamake
8.63bPhoenix Navy Issue· G'al · 111-F1
7.21bPhoenix Navy Issue· PorkChop TheBoar · Amamake
9.85bPhoenix Navy Issue· Desmond sample17 · Amamake
8.14bPhoenix Navy Issue· CrackerC · 0MV-4W
8.66bPhoenix Navy Issue· Culaure · Aldranette
8.41bPhoenix Navy Issue· han Mira · BY-MSY
7.40bPhoenix Navy Issue· DarkEternal · J124058
9.51bAttributes
Structure HP40
Calibration Cost75
Reprocessing Materials
Properties
Type ID31642
GroupRig Launcher (779)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-01318.73m4
2026-09-30320.80m2
2026-09-29321.43m3
2026-09-28324.34m5
2026-09-27325.74m7
2026-09-26329.93m3
2026-09-25331.65m2
2026-09-24333.57m3
2026-09-23316.80m3
2026-09-22340.98m4
2026-09-21343.83m3
2026-09-20347.30m2
2026-09-19342.32m5
2026-09-18352.91m13
2026-09-16364.41m13
2026-09-15366.90m3
2026-09-14371.40m4
2026-09-13373.20m2
2026-09-12376.37m3
2026-09-11380.10m5
2026-09-10381.43m3
2026-09-09385.30m2
2026-09-08387.17m3
2026-09-07390.60m3
2026-09-06392.02m5
2026-09-05395.95m2
2026-09-04399.40m5
2026-09-03504.87m3
2026-09-02507.40m2
2026-09-01533.70m3