Capital Hybrid Metastasis Adjuster II
Tech IICapital Hybrid Weapon RigsCapital Hybrid Metastasis Adjuster II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's hybrid turrets at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
141.70m ISK
90d Avg
141.16m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-05-19)
141.70m ISK
90d Average
141.16m ISK
90d High
190.00m ISK
90d Low
53.28m ISK
Avg Daily Volume
3
Variations(2)
Capital Hybrid Metastasis Adjuster I
Tech I
Capital Hybrid Metastasis Adjuster II
Tech II
Recent Destructions
View all →Moros Navy Issue· Arthie Madullier · 0-4VQL
7.21bMoros Navy Issue· Hensoza · Abune
5.64bMoros Navy Issue· stuN palS · J143740
8.30bMoros· Nami D Tashigi · Y0-BVN
5.50bMoros Navy Issue· ObeyTheSnail · J123602
6.56bMoros· Picolos · C-J6MT
3.11bMoros Navy Issue· Angelaa KUBI · M-MD31
6.42bMoros· ShadowBurn X · 77S8-E
2.98bMoros Navy Issue· Height of Ignorance · J151057
8.84bMoros Navy Issue· Petwa Tempo · J151057
8.71bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31584
Group ID776
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-19141.70m1
2026-05-18144.32m6
2026-05-17145.60m2
2026-05-13155.70m2
2026-05-11160.50m1
2026-05-08164.75m4
2026-05-07165.40m1
2026-05-06166.10m2
2026-05-05166.20m2
2026-05-04166.30m3
2026-04-3055.47m1
2026-04-28168.25m2
2026-04-27145.78m4
2026-04-26144.82m8
2026-04-25146.52m6
2026-04-23149.10m1
2026-04-21156.80m1
2026-04-20159.03m3
2026-04-16167.40m1
2026-04-15169.20m2
2026-04-1253.28m2
2026-04-11157.64m9
2026-04-08158.85m2
2026-04-07159.00m1
2026-04-06158.90m2
2026-04-05158.84m5
2026-04-04159.00m1
2026-04-01125.64m8
2026-03-30104.52m3
2026-03-2999.37m1