Small Hybrid Metastasis Adjuster II
Tech IISmall Hybrid Weapon RigsSmall Hybrid Metastasis Adjuster II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's hybrid turrets at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
1.60m ISK
90d Avg
1.19m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-07-03)
1.60m ISK
90d Average
1.19m ISK
90d High
1.60m ISK
90d Low
2 ISK
Avg Daily Volume
5
Variations(2)
Small Hybrid Metastasis Adjuster I
Tech I
Small Hybrid Metastasis Adjuster II
Tech II
Recent Destructions
View all →Harpy· Guffor Atremi · Nagamanen
32.69mCatalyst Navy Issue· Fogvar Adber Elongur · Jita
159.99mCormorant Navy Issue· iOBi · Aldranette
41.65mAtron· Darkon Chanlin · Heydieles
15.59mIncursus· Nagatoro Antimatter · Auga
10.30mFederation Navy Comet· Izula · Oinasiken
16.48mIshkur· Dimitry Rusland · Nisuwa
42.16mHecate· Fortress Ace · T8T-RA
96.51mIshkur· Dimitry Rusland · Hirri
38.61mIncursus· Nagatoro Antimatter · Auga
10.38mAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31580
Group ID776
Category ID7
Mass200 kg
Volume5 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-031.60m2
2026-07-021.60m10
2026-06-301.60m5
2026-06-291.60m4
2026-06-281.60m5
2026-06-271.60m7
2026-06-261.60m2
2026-06-251.60m1
2026-06-231.60m2
2026-06-221.60m1
2026-06-211.60m18
2026-06-201.60m23
2026-06-181.60m1
2026-06-161.60m13
2026-06-151.60m1
2026-06-141.60m4
2026-06-131.60m24
2026-06-121.07m3
2026-06-091.07m1
2026-06-081.07m1
2026-06-071.07m32
2026-06-061.07m2
2026-06-041.07m3
2026-06-031.07m2
2026-06-021.07m1
2026-06-011.07m2
2026-05-311.07m7
2026-05-291.07m1
2026-05-281.07m2
2026-05-271.07m3