Small Hybrid Metastasis Adjuster II
Tech IISmall Hybrid Weapon RigsSmall Hybrid Metastasis Adjuster II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's hybrid turrets at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
1.40m ISK
90d Avg
1.54m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-01)
1.40m ISK
90d Average
1.54m ISK
90d High
1.60m ISK
90d Low
0 ISK
Avg Daily Volume
5
Variations(2)
Small Hybrid Metastasis Adjuster I
Tech I
Small Hybrid Metastasis Adjuster II
Tech II
Recent Destructions
View all →Eris· jin Uchonela · KW-OAM
116.79mFederation Navy Comet· Kellico Robinett · Abune
28.26mHecate· TheTopdog · Straloin
86.15mCormorant Navy Issue· Codey Von Smuck · Aldranette
24.78mHecate· Gertrude the Goat · Ignoitton
89.89mPunisher· J3dI mynd trix · Heydieles
10.58mEnyo· halfeatenkitty kitty · Indregulle
32.58mEnyo· halfeatenkitty kitty · Heydieles
35.01mEris· Mazzic Karde · 3L3N-X
108.28mHecate· Fortress Ace · 7UTB-F
104.13mAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31580
Category ID7
Mass200 kg
Volume5 m³
Packaged Volume5 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-011.40m2
2026-09-301.60m1
2026-09-291.60m9
2026-09-281.59m1
2026-09-231.59m3
2026-09-221.59m4
2026-09-211.59m20
2026-09-201.60m2
2026-09-191.40m1
2026-09-181.60m5
2026-09-171.60m2
2026-09-121.60m2
2026-09-111.60m1
2026-09-101.60m1
2026-09-081.60m1
2026-09-071.60m1
2026-09-051.47m3
2026-09-041.60m1
2026-09-031.60m1
2026-09-021.60m1
2026-08-301.60m3
2026-08-291.60m7
2026-08-281.60m1
2026-08-271.60m2
2026-08-251.35m13
2026-08-241.50m1
2026-08-231.50m3
2026-08-201.50m4
2026-08-191.50m1
2026-08-171.50m1