Medium Hybrid Collision Accelerator II
Tech IIMedium Hybrid Weapon RigsMedium Hybrid Collision Accelerator II — Tech II Rig Hybrid Weapon (Module) — EVE Online item
This ship modification is designed to increase a ship's hybrid turret damage at the expense of increased power grid need for hybrid weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Hybrid Weapon Rigging skill.
Jita Price
15.65m ISK
90d Avg
12.56m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-01)
15.65m ISK
90d Average
12.56m ISK
90d High
34.59m ISK
90d Low
7.06m ISK
Avg Daily Volume
19
Variations(2)
Medium Hybrid Collision Accelerator I
Tech I
Medium Hybrid Collision Accelerator II
Tech II
Recent Destructions
View all →Deimos· Ryu Jin-Ma · X3-PBC
185.98mExequror Navy Issue· Tench TTTSAI · Todifrauan
91.38mExequror Navy Issue· Tench Sai · Todifrauan
91.39mExequror Navy Issue· Ronat · Aivonen
77.65mFerox Navy Issue· eltaccos · VR-YRV
204.95mNaga· Ulianov · Obanen
130.95mProteus· Ronon Inkunen-Dex · Vecamia
536.36mNaga· Ulianov · Josameto
129.06mDeimos· 2304 penguin · 57-KJB
191.78mDeimos· Martin Zhang · V6-NY1
203.96mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31546
Category ID7
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0115.65m10
2026-09-3015.85m10
2026-09-2915.51m18
2026-09-2815.09m7
2026-09-2713.97m33
2026-09-2613.95m10
2026-09-2512.48m36
2026-09-2413.78m11
2026-09-2310.05m24
2026-09-2215.98m1
2026-09-2118.41m8
2026-09-2014.68m5
2026-09-1919.12m17
2026-09-1821.37m12
2026-09-1732.58m2
2026-09-1633.67m7
2026-09-1519.22m25
2026-09-1415.50m57
2026-09-1315.79m15
2026-09-1211.64m2
2026-09-1015.84m8
2026-09-0915.85m7
2026-09-0813.02m23
2026-09-0711.50m14
2026-09-068.90m64
2026-09-058.39m6
2026-09-048.39m14
2026-09-038.39m6
2026-09-027.99m5
2026-09-018.40m26