Capital Energy Metastasis Adjuster II
Tech IICapital Energy Weapon RigsCapital Energy Metastasis Adjuster II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
26.93m ISK
90d Avg
21.39m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-26)
26.93m ISK
90d Average
21.39m ISK
90d High
39.52m ISK
90d Low
68.0k ISK
Avg Daily Volume
2
Variations(2)
Capital Energy Metastasis Adjuster I
Tech I
Capital Energy Metastasis Adjuster II
Tech II
Recent Destructions
View all →Revelation Navy Issue· Bryan Dahrma · J160941
9.17bRevelation Navy Issue· CrackerC · Akkio
8.99bRevelation Navy Issue· CrackerC · J6QB-P
9.54bRevelation· Omar Orlenhant · WY-9LL
5.03bRevelation· Mabuto Orlenhant · WY-9LL
4.70bRevelation· ssllss1 · M-MBRT
3.37bRevelation Navy Issue· Inked6 · Amamake
8.28bRevelation Navy Issue· Ares Tzestu · VKI-T7
8.99bRevelation Navy Issue· Cheng · VKI-T7
8.68bRevelation Navy Issue· Demonus663 Airuta · J135554
7.25bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31500
Group ID775
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2626.93m1
2026-08-2327.99m1
2026-08-2219.00m5
2026-08-2068.0k1
2026-08-1916.80m2
2026-08-1816.77m3
2026-08-1416.77m1
2026-08-1216.77m1
2026-08-1016.76m1
2026-08-0915.00m2
2026-08-075.04m6
2026-08-0614.99m1
2026-08-0314.99m1
2026-08-0116.79m1
2026-07-3116.50m1
2026-07-2816.50m1
2026-07-2716.40m1
2026-07-2217.40m1
2026-07-212.00m1
2026-07-1817.30m2
2026-07-1617.68m2
2026-07-1417.86m1
2026-07-1317.86m2
2026-07-1119.74m1
2026-07-0920.98m2
2026-07-0424.45m2
2026-07-0324.65m2
2026-06-2926.81m1
2026-06-2714.97m2
2026-06-2528.49m1