Capital Energy Metastasis Adjuster II
Tech IICapital Energy Weapon RigsCapital Energy Metastasis Adjuster II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
23.65m ISK
90d Avg
18.24m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-10)
23.65m ISK
90d Average
18.24m ISK
90d High
27.99m ISK
90d Low
68.0k ISK
Avg Daily Volume
2
Variations(2)
Capital Energy Metastasis Adjuster I
Tech I
Capital Energy Metastasis Adjuster II
Tech II
Recent Destructions
View all →Revelation Navy Issue· CrackerC · ZD1-Z2
9.63bRevelation· Viera-Ignis Serpentine · 8F-TK3
4.11bRevelation Navy Issue· CrackerC · Amamake
10.14bRevelation· Winston Fitzgerald · Dal
3.48bRevelation Navy Issue· CrackerC · Amamake
7.97bRevelation· Christopher Fer · J130735
5.65bRevelation Navy Issue· Puffy Penguin · SVM-3K
6.66bRevelation· Arri AlexaMini · N-8YET
5.60bRevelation Navy Issue· Ares Tzestu · Kamela
9.22bRevelation· Thorn Galen · Kamela
4.76bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31500
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-1023.65m3
2026-09-2820.00m1
2026-09-2718.56m2
2026-09-2617.00m2
2026-09-2318.12m1
2026-09-1923.00m1
2026-09-17100.0k1
2026-09-1625.00m1
2026-09-1425.61m3
2026-09-1022.50m1
2026-09-0922.49m1
2026-09-0722.49m2
2026-09-0626.87m2
2026-08-3127.00m1
2026-08-3027.00m1
2026-08-2926.86m7
2026-08-2626.93m1
2026-08-2327.99m1
2026-08-2219.00m5
2026-08-2068.0k1
2026-08-1916.80m2
2026-08-1816.77m3
2026-08-1416.77m1
2026-08-1216.77m1
2026-08-1016.76m1
2026-08-0915.00m2
2026-08-075.04m6
2026-08-0614.99m1
2026-08-0314.99m1
2026-08-0116.79m1