Medium Energy Metastasis Adjuster II
Tech IIMedium Energy Weapon RigsMedium Energy Metastasis Adjuster II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
1.12m ISK
90d Avg
1.37m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-05-24)
1.12m ISK
90d Average
1.37m ISK
90d High
2.84m ISK
90d Low
334.3k ISK
Avg Daily Volume
8
Variations(2)
Medium Energy Metastasis Adjuster I
Tech I
Medium Energy Metastasis Adjuster II
Tech II
Recent Destructions
View all →Omen Navy Issue· Luigi TONUSO · F3-8X2
84.38mOmen Navy Issue· alexander tournon · F3-8X2
91.41mAshimmu· Zycian · Miyeli
271.68mOmen Navy Issue· Finnan Bastinger · NCGR-Q
87.90mZealot· KJU JUNEF · Hilmar
442.50mLegion· Icurto · J104210
540.85mHarbinger Navy Issue· EvemanLarry Warp · IAK-JW
183.37mOmen Navy Issue· Juliette Mimieux · Sujarento
80.77mHarbinger· Resi Torr · C-N4OD
202.81mZealot· HLYY0206 · 74-VZA
211.55mAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31498
Group ID775
Category ID7
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-241.12m7
2026-05-23788.4k4
2026-05-22900.1k3
2026-05-211.12m5
2026-05-201.12m1
2026-05-191.12m1
2026-05-181.13m3
2026-05-171.06m7
2026-05-16667.8k3
2026-05-151.11m2
2026-05-141.13m8
2026-05-131.13m2
2026-05-121.13m2
2026-05-11794.5k2
2026-05-101.14m3
2026-05-091.14m5
2026-05-081.14m2
2026-05-071.01m5
2026-05-061.15m5
2026-05-05916.4k3
2026-05-041.04m6
2026-05-031.16m12
2026-05-021.13m7
2026-05-011.14m14
2026-04-301.14m9
2026-04-29848.4k12
2026-04-281.01m6
2026-04-271.14m31
2026-04-261.14m4
2026-04-25486.3k11