Capital Energy Locus Coordinator II
Tech IICapital Energy Weapon RigsCapital Energy Locus Coordinator II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the optimal range of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
9.01m ISK
90d Avg
16.96m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-03)
9.01m ISK
90d Average
16.96m ISK
90d High
57.99m ISK
90d Low
1.2k ISK
Avg Daily Volume
2
Variations(2)
Capital Energy Locus Coordinator I
Tech I
Capital Energy Locus Coordinator II
Tech II
Recent Destructions
View all →Revelation· Omar Orlenhant · WY-9LL
5.03bRevelation· Mabuto Orlenhant · WY-9LL
4.70bRevelation Navy Issue· Feed Panda · E6Q-LE
6.43bRevelation Navy Issue· Gondoleeza Ricin · S25C-K
7.89bRevelation· Adalle Hariere · Auga
3.29bRevelation· CrackerC · J122515
4.44bRevelation· Tyg Au · Pout
5.38bRevelation Navy Issue· Star Wisp · J124007
5.10bRevelation Navy Issue· Star Wisp · J124007
5.10bRevelation Navy Issue· Star Wisp · J124007
5.10bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID31488
Group ID775
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-039.01m1
2026-08-019.01m1
2026-07-314.50m1
2026-07-269.00m2
2026-07-217.99m16
2026-07-187.98m3
2026-07-157.98m7
2026-07-059.98m1
2026-07-041.2k2
2026-06-2510.91m1
2026-06-2410.94m2
2026-06-2210.97m1
2026-06-2011.80m4
2026-06-1911.80m1
2026-06-1811.90m1
2026-06-1711.96m1
2026-06-1613.37m1
2026-06-1513.58m2
2026-06-0724.36m1
2026-06-0624.93m2
2026-06-0228.77m1
2026-05-3046.95m1
2026-05-2551.41m1
2026-05-2357.99m2