Medium Energy Collision Accelerator II
Tech IIMedium Energy Weapon RigsMedium Energy Collision Accelerator II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the damage output of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
4.47m ISK
90d Avg
1.68m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-05-17)
4.47m ISK
90d Average
1.68m ISK
90d High
5.00m ISK
90d Low
11.2k ISK
Avg Daily Volume
28
Variations(2)
Medium Energy Collision Accelerator I
Tech I
Medium Energy Collision Accelerator II
Tech II
Recent Destructions
View all →Oracle· CodeWarrior · Dodixie
871.33mAugoror Navy Issue· zixiaoyaojuben001 · KVN-36
80.79mProphecy Navy Issue· Imonainen Endashi · Arvasaras
185.64mHarbinger Navy Issue· Slacker Killer · Hikkoken
184.51mHarbinger· Riki DeMaru · Z-7OK1
194.65mAugoror Navy Issue· zixiaoyaojuben001 · 15W-GC
73.17mOmen Navy Issue· Martok 0 · UEXO-Z
103.35mOracle· Dr Winnie Puuh · Akora
115.71mOmen· Lupus HKBD · LBC-AW
50.17mOracle· Cute Nado Ganker · Jita
135.66mAttributes
Structure HP40
Calibration Cost300
Reprocessing Materials
Properties
Type ID31462
Group ID775
Category ID7
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-174.47m15
2026-05-164.93m16
2026-05-152.94m17
2026-05-145.00m5
2026-05-131.46m18
2026-05-121.60m979
2026-05-111.59m7
2026-05-101.58m53
2026-05-091.60m20
2026-05-081.60m2
2026-05-071.60m1
2026-05-061.60m6
2026-05-051.58m34
2026-05-041.59m13
2026-05-031.60m2
2026-05-021.59m25
2026-05-011.60m19
2026-04-301.60m4
2026-04-291.60m2
2026-04-281.60m4
2026-04-271.60m3
2026-04-261.60m8
2026-04-251.60m5
2026-04-241.60m141
2026-04-231.60m8
2026-04-221.60m1
2026-04-211.63m1
2026-04-201.63m7
2026-04-191.60m6
2026-04-181.61m6